Refurb floor — benched & burned-in
Consoles re-flowed in the Camden lockup.
Three benches, two soldering rigs, one Chinese hot-air station. Every system that comes through the workshop door gets opened up, re-capped where the bank is suspect, re-pasted at the heatsink, and burned in for a full 24 hours before we tag it for sale.
Empty shelf
No console matches that combination.
Drop a filter or check back after Friday's drop — the shelf reloads at 18:00 GMT.
Reset filters